Name : _________________ |
||
If Ann does a job in 8 days, and Bob does it in 2 days, how long do they take together? (Nearest to the 10th...) |
If Ann does a job in 5 days, and Bob does it in 8 days, how long do they take together? (Nearest to the 10th...) |
+( ) |
|
( )+ |
++[[ ]]++ |
||
858 1.6 1.9 3.2 3.1 2.7 ( 12.5 ) 3.1 1.6 1.7 3.9 1.9 ( 12.2 ) [[ 24.7 ]] | ||
|